Proyectos europeos
Logo

Development of CO2 transport and storage demo project in Eastern Europe - Eastern Lights

Cordis

Detalles del proyecto

Objetivo

Eastern Lights (EL) is the de-risking first step to develop a large-scale CCUS cluster in Eastern Europe. The Holcim Bulgaria plant will be the heart and engine of the cluster development starting with CO2 transport and storage (T&S) demonstration in North West Bulgaria. EL will de-risk the CO2 transport and storage by eliminating the main uncertainties of T&S by industrial demonstration, in-depth studies and stakeholder engagement. By constructing and testing a km long transport pipeline fully integrated into the commercial operating CO2 storage, the key process parameters and technical aspects for a full-scale CCUS complex will be validated. The critical risks of the T&S part will be eliminated by an industrial demonstration and comprehensive set of studies leading to permitting.

To minimize the risks, saline aquifers from North West Bulgaria will be used for safe and large capacity CO2 storage close to a major CO2 source and Bulgarian pipeline corridors. Extensive geological, geophysical and testing work will be done to address critical issues as induced seismicity and safe injection over time. By actually constructing a short pipeline, specific issues like land-owner allowances will be addressed and the transport will be made ready for permitting and execution for the entire corridor cross-border cluster connecting members to the CO2 sink. Intensive communication, stakeholder consultation, cluster development and permit preparations will complete the Eastern Lights scope. As such, Eastern Lights shall unlock the CCUS potential in Eastern Europe, Bulgaria in particular and potentially Romania, therewith contributing to the Fit for 55 targets. Demonstrating an economically feasible decarbonizing track for the (cement) industry in Bulgaria, will secure jobs and economic activity in this field. Strong cross-border ties will be demonstrated by using CO2 from Tupras in Turkey (Mof4Air), and more generally contributing the EU goal to reach climate targets.

Acrónimo

Eastern Lights

Estado

SIGNED

Tema

HORIZON-CL5-2023-D3-01-17

Palabras Clave

  • CCUS
  • decarbonisation
  • Eastern Europe
  • CO2 transport
  • CO2 storage

Coste total

24.215.648,53 €

Contribución máxima UE

19.122.237,28 €

Coordinadores

HOLCIM BULGARIA AD

VRATSA, BG

Participantes

AIR LIQUIDE GAZ SANAYI VE TICARET ANONIM SIRKETI

ISTANBUL, TR

HOLCIM BELINETZERO STORAGE EAD

BELI IZVOR, BG

ER LIKID BULGARIA EOOD

PIRDOP, BG

ADVOKATSKO DRUZHESTVO SABEV I SADRUZHNITSI

SOFIA, BG

ROMCIM SA

BUCHAREST, RO

VIVACOM BULGARIA EAD

SOFIA, BG

EFUND GROUP

BORDEAUX, FR

EFUND EOOD

SOFIA, BG

FONDATSIA PERPETUUM-MOBILE

PLEVEN, BG

Turkiye Petrol Rafinerileri Anonim Sirketi

ISTANBUL, TR

INSTITUTUL NATIONAL DE CERCETARE DEZVOLTARE PENTRU GEOLOGIE SI GEOECOLOGIE MARINA - GEOECOMAR

BUCURESTI, RO

UNIVERSIDAD DE SANTIAGO DE COMPOSTELA

SANTIAGO DE COMPOSTELA, ES

EUROGAS - EUROPEAN UNION OF THE NATURAL GAS INDUSTRY

BRUXELLES, BE

FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG EV

MUNCHEN, DE

AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS

MADRID, ES

CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE CNRS

PARIS, FR

Socios

SIEMENS ENERGY GLOBAL GMBH & CO. KG

Munchen, DE

EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZUERICH

Zuerich, CH

Duración

Fecha de inicio01 de septiembre de 2024
Fecha de finalización31 de agosto de 2028
Proyectos Cordis relacionados