Proyectos europeos
Logo

5GCITY

Cordis

Detalles del proyecto

Objetivo

Delivering on the 5G promise of increased data rates, and ubiquitous coverages, poses stringent requirements on traditional vertically integrated operators. In particular, telecom operators are expected to massively roll out Small Cells, which requires finding appropriate urban spaces with both backhaul and energy availability. Network sharing becomes essential to unlock those commercial massive deployments. The open access model, or neutral host, will come to play a key role on the deployment of 5G networks, especially in urban scenarios where very dense Small Cell deploymens are required.
In parallel recent trends are paving the way towards the development of new, heterogeneous and distributed cloud paradigms that significantly differ from today’s established cloud model: with edge computing, cloud architectures are pushed all the way to the edge of the network, close to the devices that produce and act on data. We posit that there are two sets of players perfectly poised to take advantage of both trends since they already own the infrastructure needed to build edge deployments: telecommunication providers and municipalities. 5GCity focuses on how common smart city infrastructure (i.e.,small cells and processing power at the very edge of networks) can bring benefit to both players based on resource sharing and end-to-end virtualization, pushing the cloud model to the extreme edge.
5GCity will design, develop, deploy and demonstrate a distributed cloud and radio platform for municipalities and infrastructure owners acting as 5G neutral hosts. 5GCity’s main aim is to build and deploy a common, multi-tenant, open platform that extends the (centralized) cloud model to the extreme edge of the network, with a demonstration in three different cities (Barcelona, Bristol and Lucca). 5GCity will directly impact a large and varied range of actors: (i) telecom providers; (ii) municipalities; and (iii) a number of different vertical sectors utilizing the city infrastructure

Acrónimo

5GCITY

Estado

CLOSED

Tema

ICT-08-2017

Palabras Clave

No hay datos disponibles

Coste total

7.710.063,63 €

Contribución máxima UE

6.072.367,40 €

Coordinadores

FUNDACIO PRIVADA I2CAT, INTERNET I INNOVACIO DIGITAL A CATALUNYA

Barcelona, ES

Participantes

INCITES CONSULTING SA

Strassen, LU

NEC LABORATORIES EUROPE GMBH

HEIDELBERG, DE

COMUNICARE DIGITALE - ASSOCIAZIONEDI PROMOZIONE SOCIALE

Lucca, IT

BRISTOLISOPEN LIMITED

Bristol, UK

ZETTASCALE TECHNOLOGY SARL

SAINT AUBIN, FR

ACCELLERAN

ANTWERPEN, BE

COMUNE DI LUCCA

Lucca, IT

EVS BROADCAST EQUIPMENT - PORTUGAL LDA

MAIA, PT

WIND TRE SPA

Milano, IT

VIRTUAL OPEN SYSTEMS

GRENOBLE, FR

INFORMACIO I COMUNICACIO DE BARCELONA SA SOCIETAT PRIVADA MUNICIPAL

BARCELONA, ES

INSTITUT MUNICIPAL D'INFORMATICA DE BARCELONA

BARCELONA, ES

UBIWHERE LDA

AVEIRO, PT

AGENCIA DE ECOLOGIA URBANA DE BARCELONA

BARCELONA, ES

NEXTWORKS SRL

Pisa, IT

RETEVISION I SA

MADRID, ES

RAI RADIOTELEVISIONE ITALIANA SPA

ROMA, IT

BETA TLC SPA

Roma, IT

NEC EUROPE LTD

London, UK

UNIVERSITY OF BRISTOL

BRISTOL, UK

Duración

Fecha de inicio01 de junio de 2017
Fecha de finalización31 de marzo de 2020
Proyectos Cordis relacionados