Proyectos europeos
Logo

Integrated Airport Operations

Cordis

Detalles del proyecto

Objetivo

"
This project PJ28 which is part of the SESAR 2020 Multi annual Program (S2020 MAWP) for the period 2016-2019, will demonstrate the benefits that specific promising SESAR solutions will bring in a large and two mid-size airports, where traffic congestion daily takes place during the peak season and where new SESAR solutions are expected to assist controllers in their duty. PJ28 proposal addresses the topic “Integrated Airport Operations” with the topic identifier “SESAR.IR-VLD.Wave1-28-2015” as stated in the 2020 MAWP Cluster D.1 High Performing Airport Operations (pages 500-507).

As being part of the Very Large Scale Demonstrations in the Industrial Research & Validation phase, developed under the SJU Private Public Partnership SESAR2020) the objective of PJ28 is perform Very Large Scale Demonstrations (VLD) addressing airport related topics with V3 maturity in SESAR1. In detail, this PJ28 proposal focusses on four Air Traffic Management (ATM) sub-functionalities requested by the Pilot Common Project (PCP Commission Implementation Regulation IR N° 716/2014), all part of ATM Functionality #2 – Airport Integration and Throughput (AF#2) and it will conduct these in a close to operational environment. Doing so, PJ28 will play an active role in the de-risking of the later deployment phase by demonstrating the operational and technical readiness of the SESAR solutions covered in this project and thus ensure trust in the SESAR results.

Those four functionalities aim at:
• Improving airport safety;
• Improving runway throughput;
• Reducing fuel consumption;
• Reducing overall delays on the airport; and
• Improving airport capacity.

The following sub-functionalities will be implemented in dedicated demonstration platforms:
• Departure Management Synchronised with Pre-departure sequencing.
• Departure Management integrating Surface Management Constraints.
• Automated Assistance to Controller for Surface Movement Planning and Routing.
• Airport Safety Nets.
"

Acrónimo

PJ28 IAO

Estado

CLOSED

Tema

SESAR.IR-VLD.Wave1-22-2015

Palabras Clave

No hay datos disponibles

Coste total

5.066.923,02 €

Contribución máxima UE

3.546.846,12 €

Coordinadores

DEUTSCHES ZENTRUM FUR LUFT - UND RAUMFAHRT EV

KOLN, DE

Participantes

SINTEF AS

Trondheim, NO

AKCINE BENDROVE ORO NAVIGACIJA

VILNIUS, LT

HONEYWELL AEROSPACE

TOULOUSE, FR

DIRECTION DES SERVICES DE LA NAVIGATION AERIENNE

Paris, FR

INDRA NAVIA AS

ASKER, NO

RIZENI LETOVEHO PROVOZU CESKE REPUBLIKY STATNI PODNIK

Jenec, CZ

LETOVE PREVADZKOVE SLUZBY SLOVENSKEJ REPUBLIKY, STATNY PODNIK

Bratislava, SK

INTEGRA CONSULT AS

Vedbaek, DK

AIRBUS OPERATIONS SAS

Toulouse, FR

POLSKA AGENCJA ZEGLUGI POWIETRZNEJ

Warszawa, PL

AIRTEL ATN LIMITED

DUN LOAGHAIRE DUBLIN, IE

HONEYWELL INTERNATIONAL SRO

PRAHA, CZ

HONEYWELL INTERNATIONAL INC

Charlotte, US

INDRA SISTEMAS SA

ALCOBENDAS MADRID, ES

SAAB AKTIEBOLAG

Linkoping, SE

AIRBUS

Blagnac, FR

STIFTELSEN SINTEF

Trondheim, NO

THALES AVS FRANCE SAS

Merignac, FR

STICHTING KONINKLIJK NEDERLANDS LUCHT - EN RUIMTEVAARTCENTRUM

AMSTERDAM, NL

Duración

Fecha de inicio01 de diciembre de 2016
Fecha de finalización29 de febrero de 2020
Proyectos Cordis relacionados