Proyectos europeos
Logo

Start-up activities for Advanced Signalling and Automation Systems

Cordis

Detalles del proyecto

Objetivo

X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.
The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation systems towards a flexible, real-time, intelligent traffic management and decision support system.
The actions to be undertaken in the scope of X2Rail-1 are related to the following specific objectives:
To overcome the limitations of the existing communication systems by adapting radio communication systems which establish the backbone for the next generation advanced rail automation systems.
To improve the usable track capacity by introducing more Automatic Train Operation (ATO) systems and Moving Block systems.
To innovate the signalling architectures towards more decentralized and less cost intensive systems by incorporating Moving Block systems and Smart Wayside Objects.
To minimize energy consumption and to improve train punctuality through more extensive use of Automatic Train Operation (ATO) systems.
To increase innovation in the field of lab testing by developing architectures for new lab test systems and simulations for control, command and communication systems in order to reduce costs.
To ensure security among all connected signalling and control systems by developing new cyber security systems dedicated to railways.
To ensure the backward compatibility of ERMTS/ETCS technologies, notwithstanding of the required functional enrichment of the future signalling and control systems.

Acrónimo

X2Rail-1

Estado

CLOSED

Tema

S2R-CFM-IP2-01-2015

Palabras Clave

  • Shift2Rail
  • Innovation Programme 2
  • IP2
  • Control Systems
  • IP Communication
  • Automatic Train Operation
  • ATO
  • Moving Block
  • System and Integration Test
  • Smart Wayside Objects
  • Cyber Security
  • ETCS
  • CBTC

Coste total

18.090.998,97 €

Contribución máxima UE

18.090.998,97 €

Coordinadores

SIEMENS MOBILITY GMBH

MUNCHEN, DE

Participantes

KONTRON TRANSPORTATION FRANCE SAS

SAINT QUENTIN YVELINES CEDEX, FR

KONTRON TRANSPORTATION DEUTSCHLAND GMBH

IMMENSTAAD AM BODENSEE, DE

RAILENIUM

FAMARS, FR

KONTRON TRANSPORTATION GmbH

Wien, AT

SYSTRA SA

Paris, FR

GEIE DES UTILISATEURS D'ERTMS

Bruxelles / Brussel, BE

ALSTOM RAIL SWEDEN AB

VASTERAS, SE

CAF SIGNALLING S.L

San Sebastian, ES

TRAFIKVERKET - TRV

Borlange, SE

ALSTOM FERROVIARIA SPA

Savigliano, IT

MER MEC SPA

Monopoli, IT

THALES ESPAÑA GRP S.A.

Madrid, ES

CONSTRUCCIONES Y AUXILIAR DE FERROCARRILES INVESTIGACION Y DESARROLLO SL

Beasain, ES

SCHWEIZERISCHE BUNDESBAHNEN SBB

Bern, CH

SNCF RESEAU

LA PLAINE SAINT-DENIS, FR

HACON INGENIEURGESELLSCHAFT MBH

Hannover, DE

THALES TRANSPORTATION SYSTEMS GMBH

Ditzingen, DE

AZD PRAHA SRO

Praha, CZ

HITACHI RAIL STS SPA

NAPOLI, IT

ALSTOM BELGIUM SA

CHARLEROI, BE

DB INFRAGO AG

FRANKFURT AM MAIN, DE

NETWORK RAIL INFRASTRUCTURE LIMITED

LONDON, UK

ASOCIACION CENTRO TECNOLOGICO CEIT

SAN SEBASTIAN, ES

HITACHI RAIL GTS AUSTRIA GMBH

WIEN, AT

ALSTOM TRANSPORT SA

Saint Ouen, FR

INDRA SISTEMAS SA

ALCOBENDAS MADRID, ES

DEUTSCHE BAHN AG

Berlin, DE

DEUTSCHES ZENTRUM FUR LUFT - UND RAUMFAHRT EV

KOLN, DE

SIEMENS AKTIENGESELLSCHAFT

MUNCHEN, DE

KUNGLIGA TEKNISKA HOEGSKOLAN

STOCKHOLM, SE

Duración

Fecha de inicio01 de septiembre de 2016
Fecha de finalización30 de junio de 2021
Proyectos Cordis relacionados