Proyectos europeos
Logo

Energy Local Storage Advanced system (ELSA)

Cordis

Detalles del proyecto

Objetivo

Integration of distributed small/medium size storage systems can allow operating distribution grids much more flexibly, thus realizing smart grid features like local demand-supply balancing, congestion relief, peak shaving and effective RES integration.

However, few technologically mature decentralized storage systems are commercially available today at affordable prices, while both viable business models and the underlying legal and regulatory framework are lagging behind.

As an answer ELSA will implement and demonstrate an innovative solution integrating low-cost second-life Li-ion batteries and other direct and indirect storage options, including heat storage, demand-side management, as well as use of intermittent RES.

The core idea is to consider Storage as a Service towards building and district managers for local energy management optimization, and towards DSO for enhanced network operations. ELSA will adapt, build upon, and integrate close-to-mature (TRL>=5) storage technologies and related ICT-based energy management systems for the management and control of local loads, generation and single or aggregated real or virtual storage resources, including demand response, in buildings, districts and distribution grids.

Data models ensuring interoperability among building, districts and DSOs and novel business models enabled by energy storage “as-a-service” will be developed.

Different configurations will be demonstrated along six test sites, where a set of different storage technologies will be integrated. Safety issues and social acceptance will be dealt with by communication and product reliability demonstration.
A technical, economic and environmental validation, involving relevant stakeholders, will be carried out to nurture the European-wide replication of the ELSA concept, prepare the ground for a concrete roll out of the resulting TRL9 technologies and provide input for regulatory framework adaptation.

Acrónimo

ELSA

Estado

CLOSED

Tema

LCE-08-2014

Palabras Clave

No hay datos disponibles

Coste total

13.083.061,25 €

Contribución máxima UE

9.861.612,50 €

Coordinadores

BOUYGUES ENERGIES & SERVICES

Montigny Le Bretonneux, FR

Participantes

EGRID APPLICATIONS & CONSULTING GMBH

Kempten (Allgaeu), DE

ALLGAUER UBERLANDWERK GMBH

Kempten (Allgäu), DE

Nissan West Europe SAS

VOISINS LE BRETONNEUX, FR

ASM TERNI SPA

Terni, IT

Gateshead College

Gateshead, UK

COLLINS AEROSPACE IRELAND, LIMITED

Cork, IE

Nissan Motor Manufacturing (UK) Limited

Sunderland, UK

B.A.U.M. CONSULT GMBH

Munchen, DE

NISSAN MOTOR IBERICA SA

Barcelona, ES

RENAULT SAS

BOULOGNE BILLANCOURT, FR

ENGINEERING - INGEGNERIA INFORMATICA SPA

ROMA, IT

RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN

Aachen, DE

Duración

Fecha de inicio01 de abril de 2015
Fecha de finalización31 de diciembre de 2018
Proyectos Cordis relacionados