Proyectos europeos
Logo

FUTURE OCEAN RENEWABLE ENERGY SYSTEM TECHNOLOGIES (FOREST)

Cordis

Detalles del proyecto

Objetivo

FOREST will drive groundbreaking advancements in subsea components and digital technologies for ocean energy systems, setting new global standards for durability, reliability, and efficiency in the sector. By addressing the most pressing challenges identified from 34 different device trials over the last 20 years at EMEC, the FOREST project will deliver transformative innovations. These include a 33kV super dynamic cable and spar connection hub specifically designed by Sub Connected for ocean energy arrays, an advanced cable quick connector system from Apollo that streamlines deployment and maintenance, and a cutting-edge optical measurement platform from Indeximate, incorporating artificial intelligence and machine learning from CENER and Intelligent Plant to measure cable and device health and optimise array performance.

These technologies will be rigorously validated at EMEC’s internationally recognised wave and tidal test sites, leveraging €40M of established infrastructure and its world-leading wave and tidal developer companies. By meeting the highest international standards supported by Bureau Veritas, FOREST will generate invaluable knowledge on how to operate ocean energy devices, their availability, maintainability, reliability, survivability and sustainability and this new knowledge will be driven into the sector by the Wave Energy Centre.

The outputs from FOREST will directly contribute to the 1GW Ocean Energy target outlined in the EU’s Strategy on Offshore Renewable Energy and the objectives in the Strategic Energy Technology (SET) Plan by addressing key technical, environmental, and economic barriers which will enhance the bankability and insurability of ocean energy systems. This will drive the global deployment of ocean energy farms, contributing to Europe’s leadership in clean energy innovation and supporting the transition to a net-zero economy.

Acrónimo

FOREST

Estado

SIGNED

Tema

HORIZON-CL5-2024-D3-02-04

Palabras Clave

No hay datos disponibles

Coste total

3.994.425,00 €

Contribución máxima UE

3.994.425,00 €

Coordinadores

THE EUROPEAN MARINE ENERGY CENTRE LIMITED

STROMNESS, UK

Participantes

BUREAU VERITAS SOLUTIONS MARINE & OFFSHORE LIMITED

ABERDEEN, UK

APOLLO ENGINEERING CONSULTANTS LIMITED

ABERDEEN, UK

INDEXIMATE LTD

HINCKLEY, UK

INTELLIGENT PLANT LIMITED

ABERDEEN, UK

SUB CONNECTED AB

VASTRA FROLUNDA, SE

WAVEC/OFFSHORE RENEWABLES - CENTRO DE ENERGIA OFFSHORE ASSOCIACAO

LISBOA, PT

FUNDACION CENER

SARRIGUREN, ES

Duración

Fecha de inicio01 de noviembre de 2025
Fecha de finalización31 de octubre de 2028
Proyectos Cordis relacionados