Proyectos europeos
Logo

300mm Pilot Line for Smart Power and Power Discretes

Cordis

Detalles del proyecto

Objetivo

R3-POWERUP will push through the new generation of 300mm Pilot Line Facility for Smart Power technology in Europe. This will enable the European industry to set the world reference of innovative and competitive solutions for critical societal challenges, like Energy saving and CO2 Reduction (ref. to COP21 Agreement ), as well as Sustainable Environment through electric mobility and industrial power efficiency.

● Development and demonstration of a brand new 300mm advanced manufacturing facility addressing a multi-KET Pilot Line (i.e. Nanoelectronics, Nanotechnology, Advanced Manufacturing)
● Improvement in productivity and competitiveness of integrated IC solutions for smart power and power discrete technologies.

The strategy of the project is the following:
● The Pilot Line will enable the realization of sub-100nm Smart Power processes, starting from the 90nm BCD10 process, taking profit from the advanced and peculiar equipments available only for 300mm wafer size.
● The availability of a 300mm full processing line will also exploit the portability to 300mm of the most critical and expensive process steps devoted to power discrete devices.
● The Pilot Line will build on Digital Factory and Industry 4.0 principles, enforcing a flexible, adaptive and reliable facility, in order to investigate also the synergy and economic feasibility of supporting both Smart Power and power discrete processes in the same manufacturing line.
● The application of such technologies will be a breakthrough enabler for Energy Efficiency and CO2 Reduction worldwide, in line with COP21’s global action plan.

The Pilot Line is based on three main pillars:

  1. Market driven continuous innovation on smart-power and power discrete;
  2. Industrial policy focused on high quality and mass production’s cost optimization;
  3. Set the ground for future wafer upgrade of “More than Moore” disruptive technologies (e.g. advanced MEMS manufacturing, now at 200mm)

Acrónimo

R3-PowerUP

Estado

CLOSED

Tema

ECSEL-2016-2

Palabras Clave

  • smart power technology
  • power electronics
  • nanoelectronics Pilot Line
  • energy saving
  • CO2 reduction
  • sustainable environment

Coste total

180.318.047,50 €

Contribución máxima UE

28.046.206,50 €

Coordinadores

STMICROELECTRONICS SRL

Agrate Brianza, IT

Participantes

NOVA MEASURING INSTRUMENTS GMBH

DRESDEN, DE

SIEC BADAWCZA LUKASIEWICZ - INSTYTUT MIKROELEKTRONIKI I FOTONIKI

WARSZAWA, PL

ASM EUROPE BV

Almere, NL

APPLIED MATERIALS IRELAND LIMITED

Maynooth, IE

AP&S INTERNATIONAL GMBH

Donaueschingen, DE

APPLIED MATERIALS FRANCE

Bernin, FR

LASER SYSTEMS & SOLUTIONS OF EUROPE

Gennevilliers, FR

LAM RESEARCH SAS

Meylan, FR

KLA-Tencor MIE GmbH

Weilburg, DE

TRITEM SPOLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA

Katowice, PL

DISCO HI-TEC EUROPE GMBH

KIRCHHEIM, DE

ICOS VISION SYSTEMS NV

Heverlee, BE

NANO DESIGN SRO

Bratislava, SK

ADVANCED PACKAGING CENTER BV

Duiven, NL

NOVA LTD

REHOVOT, IL

APPLIED MATERIALS ISRAEL LTD

REHOVOT, IL

SOITEC SA

BERNIN, FR

SILTRONIC AG

MUNCHEN, DE

BESI AUSTRIA GMBH

RADFELD, AT

GREEN POWER TECHNOLOGIES SL

Bollullos De La Mitacion Sevilla, ES

PICOSUN OY

Espoo, FI

EV GROUP E. THALLNER GMBH

ST FLORIAN AM INN, AT

ATOTECH DEUTSCHLAND GMBH

Berlin, DE

CONSORZIO NAZIONALE INTERUNIVERSITARIO PER LA NANOELETTRONICA

BOLOGNA, IT

INSTITUT MIKROELEKTRONICKYCH APLIKACI SRO

PRAHA 5, CZ

UNIVERSITATEA POLITEHNICA DIN BUCURESTI

Bucharest, RO

UNIVERSIDAD DE SEVILLA

Sevilla, ES

UNIVERSITA DI PISA

PISA, IT

SLOVENSKA TECHNICKA UNIVERZITA V BRATISLAVE

Bratislava, SK

VYSOKE UCENI TECHNICKE V BRNE

BRNO STRED, CZ

POLITECNICO DI MILANO

Milano, IT

UNIVERSITA DEGLI STUDI DI PAVIA

Pavia, IT

UNIVERSITA DEGLI STUDI DI UDINE

Udine, IT

ROBERT BOSCH GMBH

Gerlingen-Schillerhoehe, DE

POLITECNICO DI TORINO

Torino, IT

CONSIGLIO NAZIONALE DELLE RICERCHE

Roma, IT

ALMA MATER STUDIORUM - UNIVERSITA DI BOLOGNA

Bologna, IT

UNIVERSITA DEGLI STUDI DI PADOVA

PADOVA, IT

Duración

Fecha de inicio01 de noviembre de 2017
Fecha de finalización30 de abril de 2023
Proyectos Cordis relacionados