Proyectos europeos
Logo

Flexible Fossil Power Plants for the Future Energy Market through new and advanced Turbine Technologies

Cordis

Detalles del proyecto

Objetivo

The share of renewable energy is growing rapidly driven by the objective to reduce greenhouse gas emissions. The amount of electric power which can be supplied to the grid depends on the time of the day and weather conditions. A conventional fleet of thermal power plants is required to compensate for these fluctuations before large scale energy storage technologies will be mature and economically viable. All power market projections expect this to be the case for the next 50 years at least. For a strong expansion of renewables, this fleet has to operate flexibly at competitive cost.
Current power plants cannot fill this role immediately without impeding their efficiency and engine lifetime through increased wear and damage induced by the higher number of (shorter) operating/loading cycles. New technologies need to be introduced to balance demand peaks with renewable output fluctuations at minimal fuel consumption and emissions without negative effects on cycling operation. The FLEXTURBINE partners have developed a medium to long term technology roadmap addressing future and existing power plants. The FLEXTURBINE project presented hereafter is the first step in such technology roadmap and consists of: (1) new solutions for extended operating ranges to predict and control flutter, (2) improved sealing and bearing designs to increase turbine lifetime and efficiency by reducing degradation/damages, and (3) an improved lifecycle management through better control and prediction of critical parts to improve competitive costs by more flexible service intervals and planned downtime, and by reducing unplanned outages. In all areas, individual technologies will be developed from TRL 3 to TRL 4-6.
FLEXTURBINE brings together the main European turbine manufacturers, renowned research institutes and universities. It involves plant and transmission system operators to include user feedback and to prepare the take-up of the FLEXTURBINE technologies in power plants world-wide.

Acrónimo

FLEXTURBINE

Estado

CLOSED

Tema

LCE-17-2015

Palabras Clave

  • Fossil power plants
  • enabling flexible operation
  • turbine technologies
  • lifecycle management
  • aero-elastic response
  • turbine blades
  • flutter
  • sealing
  • bearing
  • component life time

Coste total

10.653.882,50 €

Contribución máxima UE

6.477.595,50 €

Coordinadores

DOOSAN SKODA POWER SRO

PLZEN, CZ

Participantes

NUOVO PIGNONE TECNOLOGIE SRL

Firenze, IT

ANSALDO ENERGIA SWITZERLAND AG

Baden, CH

NUOVO PIGNONE SRL

Firenze, IT

COMTES FHT AS

Dobřany, CZ

SIEMENS ENERGY INDUSTRIAL TURBOMACHINERY LIMITED

LINCOLN, UK

EVERLLENCE SE

Augsburg, DE

GENERAL ELECTRIC DEUTSCHLAND HOLDING GMBH

Frankfurt Am Main, DE

KARLSRUHER INSTITUT FUER TECHNOLOGIE

Karlsruhe, DE

University of Belgrade - Faculty of Mechanical Engineering

Belgrade, RS

ANSALDO ENERGIA SPA

Genova, IT

PNO Innovation

PARIS, FR

GENERAL ELECTRIC (SWITZERLAND) GMBH

Baden, CH

ZAPADOCESKA UNIVERZITA V PLZNI

Pilsen, CZ

CESKE VYSOKE UCENI TECHNICKE V PRAZE

PRAHA, CZ

LINKOPINGS UNIVERSITET

Linkoping, SE

UNIVERSITA DI PISA

PISA, IT

LULEA TEKNISKA UNIVERSITET

LULEA, SE

POLITECNICO DI MILANO

Milano, IT

UNIVERSITA DEGLI STUDI DI FIRENZE

Florence, IT

TECHNISCHE UNIVERSITAET DRESDEN

DRESDEN, DE

TECHNISCHE UNIVERSITAET MUENCHEN

Muenchen, DE

TECHNISCHE UNIVERSITAT DARMSTADT

DARMSTADT, DE

SIEMENS AKTIENGESELLSCHAFT

MUNCHEN, DE

RUHR-UNIVERSITAET BOCHUM

Bochum, DE

Duración

Fecha de inicio01 de enero de 2016
Fecha de finalización31 de marzo de 2019
Proyectos Cordis relacionados