Proyectos europeos
Logo

Total Full Ecologic Embedded Railways Jacket System

Cordis

Detalles del proyecto

Objetivo

The Total Full Embedded Railways Jacket System: this new embedded railways jacket system designed by Prefarails is
used to reduce the vibration of the vehicles, minimize the road and housing noise and vibrations around the tramways or
trains, improve the passengers comfort and minimize the environment impacts.
In addition to the above characteristics, the system also offers the following main advantages:

  • Better electrical insulation of rails
  • High temperature resistance
  • Short construction time
  • Long product and concrete trackbed lifecycle
  • Less soil preparation and installation time
  • Direct and indirect economic benefits
  • Waterproof system
    The improvement of the electrical insulation will allow Prefarails to develop its activities in the railways system with the
    signaling done by measuring rails insulation.
    The support provided for this Phase I of the project will allow the company to perform the following:
  • realization of the market analysis
  • development of the marketing plan
  • elaboration of the business plan
    The support foreseen at the Phase II of the project will help the company to perform the following:
  • acquire the necessary equipments and services for the industrialization phase
  • customize the module to achieve the dimensions required by some customers (SNCF- France, SNCB - Belgium, Eitihad
    Rail - Saoudi Arabia, oman Railways) for the pilot test phase
  • support the market development
    Several railways networks operators are looking for this solution, especially for the realization of the prefabricated railways
    made with the Prefarails' technology, which has a much higher life duration, is maintenance free and is cheaper than the
    existing solutions.

Acrónimo

eco-railjacket

Estado

CLOSED

Tema

IT-1-2014-1

Palabras Clave

  • embedded rails
  • vibration reduction
  • electrical insulation
  • waterproof
  • noise reduction
  • installation time
  • reduction
  • fully recycled

Coste total

71.429,00 €

Contribución máxima UE

50.000,00 €

Coordinadores

C.A.S.Q.C. PREFARAILS

Soignies, BE

Duración

Fecha de inicio01 de febrero de 2015
Fecha de finalización31 de mayo de 2015
Proyectos Cordis relacionados