Proyectos europeos
Logo

Digitalization and Automation of Freight Rail

Cordis

Detalles del proyecto

Objetivo

Within the challenges highlighted in the IP5 part of the S2R Master Plan, FR8RAIL II further focuses on improving the freight eco system by addressing various challenges: New automatic couplers (1), provided with electrical and data transmission functionalities will massively improve the efficiency of the train composition process, new telematics and electrification (2) will enable Condition Based Maintenance (CBM) by collecting, transmitting and using the necessary information while being supplied with the required energy by means of an advanced energy management system.
Improved methods for annual and short-term timetable planning (3) will help traffic operators increasing the overall capacity and raise punctuality and with Real-time network management (4), integrating medium to short-term and operational planning at yards/terminals and in the railway network, inefficiencies will be further reduced or even eliminated.
Future freight wagon design (5) is a stream that will contribute in improving reliability of the freight transport while increasing the payload per meter of train. The latter one will be propelled by future main line electric freight locomotives featuring highly flexible freight propulsion (6) systems with reduced operational costs. Furthermore, these new freight trains will be propelled by more than one locomotive running with distributed power (7), thus allowing long freight trains up to 1,500 m. Last but not least, focus is given to driver advisory aystems that are connected (C-DAS) to the traffic management systems (8), further enhancing capacity, improving punctuality and optimize energy consumption of the railway system.
Summarizing, FR8RAIL II focuses on various facets of the freight eco system with one goal: overall improvement and increase of competitiveness of the rail freight transport.

Acrónimo

FR8RAIL II

Estado

CLOSED

Tema

S2R-CFM-IP5-01-2018

Palabras Clave

  • Wagon Design
  • Running Gears
  • Smart Assets
  • Electrification
  • Long Trains
  • Propulsion Systems
  • Condition Based Maintenance

Coste total

0,00 €

Contribución máxima UE

5.461.568,31 €

Coordinadores

ALSTOM TRANSPORTATION GERMANY GMBH

BERLIN, DE

Participantes

PJ MONITORING GMBH

Graz, AT

ALSTOM SCHWEIZ AG

Zurich, CH

FAIVELEY TRANSPORT WITTEN GMBH

WITTEN, DE

KNORR-BREMSE VASUTI JARMU RENDSZEREK HUNGARIA KORLATOLT FELELOSSEGU TARSASAG

Budapest, HU

DB SYSTEMTECHNIK GMBH

MINDEN, DE

PJ MESSTECHNIK GMBH

Graz, AT

CONTRAFFIC GMBH

Berlin, DE

DB CARGO AKTIENGESELLSCHAFT

Mainz, DE

BOMBARDIER TRANSPORTATION ITALY SPA

Vado Ligure, IT

CENTRO DE ENSAYOS Y ANALISIS CETEST SL

Beasain, ES

TRAFIKVERKET - TRV

Borlange, SE

TATRAVAGONKA AS

Poprad, SK

FAIVELEY TRANSPORT ITALIA SPA

Piossasco To, IT

CONSTRUCCIONES Y AUXILIAR DE FERROCARRILES INVESTIGACION Y DESARROLLO SL

Beasain, ES

KNORR-BREMSE SYSTEME FUR SCHIENENFAHRZEUGE GMBH

Munchen, DE

Construcciones y Auxiliar de Ferrocarriles, S.A.

Beasain, ES

VIRTUAL VEHICLE RESEARCH GMBH

Graz, AT

HITACHI RAIL STS SPA

NAPOLI, IT

MATERIALS CENTER LEOBEN FORSCHUNG GMBH

LEOBEN, AT

LINDHOLMEN SCIENCE PARK AKTIEBOLAG

GOTHENBURG, SE

DB INFRAGO AG

FRANKFURT AM MAIN, DE

AC2T RESEARCH GMBH

Wiener Neustadt, AT

BLEKINGE TEKNISKA HOGSKOLA

KARLSKRONA, SE

STATENS VAG- OCH TRANSPORTFORSKNINGSINSTITUT

Linkoping, SE

ASOCIACION CENTRO TECNOLOGICO CEIT

SAN SEBASTIAN, ES

RISE RESEARCH INSTITUTES OF SWEDEN AB

Boras, SE

LINKOPINGS UNIVERSITET

Linkoping, SE

LULEA TEKNISKA UNIVERSITET

LULEA, SE

LUNDS UNIVERSITET

Lund, SE

SOCIETE NATIONALE SNCF

ST DENIS, FR

INDRA SISTEMAS SA

ALCOBENDAS MADRID, ES

DEUTSCHE BAHN AG

Berlin, DE

CHALMERS TEKNISKA HOGSKOLA AB

GOTEBORG, SE

DEUTSCHES ZENTRUM FUR LUFT - UND RAUMFAHRT EV

KOLN, DE

KUNGLIGA TEKNISKA HOEGSKOLAN

STOCKHOLM, SE

Duración

Fecha de inicio01 de mayo de 2018
Fecha de finalización31 de diciembre de 2022
Proyectos Cordis relacionados