Expected Outcome:
Large PV systems such as utility scale PV are evolving towards higher voltage architecture (>=3kV) with the objective to minimize losses and improve system efficiency at lower costs. The intention is to integrate also storage into such (hybrid) PV systems offering flexibility. It is consequently essential to build a blueprint for the implementation of high voltage large PV systems and the development of Direct Current (DC) networks around strategic end users for high voltage demand (industrial sites, servers, electric vehicle charging stations…). Understanding the factors that influence the performance and economics of these system architectures will help system planners evaluate the potential benefits of such hybrid resources that could support an increasing future industrial electrification. Another crucial challenge to address in ensuring the continued growth of new investments in solar PV, is the increasing occurrence of zero or negative prices in the electricity market, which dramatically hurt the profitability of operating solar PV assets. To tackle this challenge, PV participation to ancillary services is a way forward, which would reduce significantly system operating costs and PV curtailment and improve system reliability and PV profitability. The coupling/pooling with other generation assets or storage/demand assets is also to be considered.
Project results are expected to contribute to all of the following expected outcomes as indicated for the proposed scope (high voltage DC PV systems or PV participation in electricity markets):
Scope 1: High-voltage DC PV systems:
Scope 2: PV participation in electricity markets:
All proposals are expected to support the execution of the solar energy joint research and innovation agenda.
Scope:
Proposals are expected to cover at least one of the following scopes:
Scope 1: High-voltage DC PV systems:
Scope 2: PV participation in electricity markets:
Whenever the expected exploitation of project results entails developing, creating, manufacturing and marketing a product or process, or in creating and providing a service, the plan for the exploitation and dissemination of results must include a strategy for such exploitation as well as a strong business case and sound exploitation strategy. The exploitation plan should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).
This topic implements the co-programmed European Partnership for Innovation in Photovoltaics (EUPI-PV). As such, projects resulting from this topic will be expected to report on the results to the European Partnership for Innovation in Photovoltaics (EUPI-PV) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.
No hay datos disponibles
This Destination includes activities targeting a sustainable, secure and competitive energy supply. In line with the scope of cluster 5, this includes activities in the areas of renewable energy; energy system, grids and storage; as well as Carbon Capture, Utilisation and Storage (CCUS).
This Destination contributes directly to the Strategic Plan’s Key Strategic Orientations ‘Green transition’, ‘Digital transition’ and ‘A more resilient, competitive, inclusive and democratic Europe’.
In line with the Strategic Plan, the overall expected impact of this Destination is to contribute to the ‘Ensuring more sustainable, secure and competitive energy supply through solutions for smart energy systems based on renewable energy solutions’.
This destination contributes to the activities of the Strategic Energy Technology Plan (SET Plan) and its implementation working groups.
The main impacts to be generated by topics under this Destination are:
Renewable energy
Energy systems, grids and storage
Carbon capture, use and storage (CCUS) and carbon dioxide removal (CDR)
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination. For additional information please see “Restrictions on the participation of legal entities established in China” found in General Annex B of the General Annexes.
[1] For an example of a methodology for the assessment of sustainability, circularity and contribution to EU resilience and technological autonomy of clean energy technology in the R&I pipeline, please see Study on circular approaches for a sustainable and affordable clean energy transition
HORIZON Innovation Actions
HORIZON-CL5-2027-07-D3-17, HORIZON-CL5-2027-07