Expected Outcome:
Project results are expected to contribute to all the following expected outcomes:
Scope:
Projects are expected to address all the following items:
The demonstration, test and validation of the activities must be carried out in at least two pilots in different EU Member States or Associated Countries. The pilots are expected to address diverse solutions (including voltage levels and geographical landscapes).
Projects are expected to include at least: one electricity TSO, two DSOs, one provider of technology that includes GFIs, one RES-based energy producer, and one university and/or research organisation.
Additionally, collaboration is encouraged with:
This collaboration (minimum number of entities) is sought per project in total and does not necessarily apply per each pilot in particular.
Selected projects are expected to contribute to the BRIDGE initiative[1] and actively participate in its activities.
Proposals are encouraged to consider, where relevant, services offered by European research infrastructures[2], as well as related projects offering access to research infrastructures in the electricity grid domain- particularly RISEnergy[3].
International cooperation is encouraged, especially with Mediterranean countries other than the EU and with Latin America and the Caribbean.
null
Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B. Activities may start at any TRL.
[1] https://bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/
[2] The catalogue of European Strategy Forum on Research Infrastructures (ESFRI) research infrastructures portfolio can be browsed from ESFRI website https://ri-portfolio.esfri.eu/
[3] RISE Energy- Homepage -
No hay datos disponibles
This Destination includes activities targeting a sustainable, secure and competitive energy supply. In line with the scope of cluster 5, this includes activities in the areas of renewable energy; energy system, grids and storage; as well as Carbon Capture, Utilisation and Storage (CCUS).
This Destination contributes directly to the Strategic Plan’s Key Strategic Orientations ‘Green transition’, ‘Digital transition’ and ‘A more resilient, competitive, inclusive and democratic Europe’.
In line with the Strategic Plan, the overall expected impact of this Destination is to contribute to the ‘Ensuring more sustainable, secure and competitive energy supply through solutions for smart energy systems based on renewable energy solutions’.
This destination contributes to the activities of the Strategic Energy Technology Plan (SET Plan) and its implementation working groups.
The main impacts to be generated by topics under this Destination are:
Renewable energy
Energy systems, grids and storage
Carbon capture, use and storage (CCUS) and carbon dioxide removal (CDR)
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination. For additional information please see “Restrictions on the participation of legal entities established in China” found in General Annex B of the General Annexes.
[1] For an example of a methodology for the assessment of sustainability, circularity and contribution to EU resilience and technological autonomy of clean energy technology in the R&I pipeline, please see Study on circular approaches for a sustainable and affordable clean energy transition
HORIZON Innovation Actions
HORIZON-CL5-2026-03-D3-18, HORIZON-CL5-2026-03