Expected Outcome:
Project outputs and results are expected to contribute to all the following expected outcomes:
Scope:
This topic aims to improve the suitability of fully-battery-electric operation of ferries, short sea shipping, offshore and inland vessels, considering the services they provide, their operation profiles and the possibilities to interact with charging infrastructure. Aspects like increasing the autonomy range of operation and fast charging are a crucial element for short sea shipping and inland routes with short docking periods. Fast charging may also put added strain on batteries in terms of output and durability. Optimization of the onboard electrical architecture and battery chemistry as well as optimized battery monitoring and management systems and more extensive training of crew can to some extent address this challenge. Life cycle aspects should be considered by design in the integration and operation of vessels, as well as the end-of-life of batteries, making sure that operations can be performed during the whole expected life of the vessel. The topic also explores the need to increase the power capability of fully electric vessels, aiming to define scenarios in which the increase of the peak propulsion power is needed to ensure the safety of operations. Proposals should cover the interface between vessels and port operations addressing the regulatory requirements, including operational procedures.
Proposals should address all the following aspects:
Proposals must justify the contribution of their objectives, results, intellectual property (IP) management and exploitation strategy to the EU added value creation and strategic autonomy throughout the supply and value chain, including competitiveness of the EU waterborne industry, enhancement of the EU’s R&I capacity, technological know-how capabilities and human capital, and resilience of the EU industrial and manufacturing base. Proposals are encouraged to prioritise shipyards, equipment manufacturers and suppliers located in the EU and EEA.
This topic implements the co-programmed European Partnership on ‘Zero Emission Waterborne Transport’ (ZEWT). As such, projects resulting from this topic will be expected to report on results to the European Partnership ‘Zero Emission Waterborne Transport’ (ZEWT) in support of the monitoring of its KPIs.
null
Activities are expected to achieve TRL 8 by the end of the project – see General Annex B. Activities may start at any TRL.
No hay datos disponibles
This Destination addresses activities that improve the climate and environmental footprint, as well as competitiveness, of different transport modes.
The areas of rail and air traffic management will be addressed through dedicated Institutional European Partnerships and are therefore not included in this document.
This Destination contributes directly to the Strategic Plan’s Key Strategic Orientations ‘Green transition’, ‘Digital transition’ and ‘A more resilient, competitive, inclusive and democratic Europe’.
In line with the Strategic Plan, the overall expected impact of this Destination is to contribute to the ‘Achieving sustainable and competitive transport modes’.
The main impacts to be generated by topics under this Destination are:
Zero-emission road transport
Aviation
Waterborne transport
Transport-related environment and health
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination. For additional information please see “Restrictions on the participation of legal entities established in China” found in General Annex B of the General Annexes.
HORIZON Innovation Actions
HORIZON-CL5-2027-03-D5-18, HORIZON-CL5-2027-03