Expected Outcome:
For a renewables-based electricity system sufficient flexible and also in the long-run fully sustainable hydropower capacity is pivotal.
Project results are expected to contribute to all of the following expected outcomes:
Scope:
Demonstration of hydropower technology solutions which allow for efficient and forward-looking refurbishment of existing hydropower plants. Provided solutions must be socioeconomically and environmentally sustainable (including biodiversity) and provide a respective assessment. Issues which can be addressed are for example: Innovative design of turbines (and also draft tubes, nozzles and distributors) and generators, including innovative improvements based on future load cycles and extending their intended life time; new models and simulation tools for harsher operational conditions; digitalisation and artificial intelligence to advance instrumentation and controls and flexibility and to develop innovative operational strategies towards reduced O&M costs; transient aspect linked to new operating patterns of hydro plants to cope with climate changes and renewable base load; new materials for increased efficiency and resistance of equipment and increased performance, life time and resilience of infrastructure including e.g. phasing out of PFAS and mineral oils; low-GHG balance concrete; automated maintenance of metal hydropower turbines to reduce cost; operator hazards and reduce LCoE related to OPEX; Improving water uses resilience via integrated operations and management; simulation and forecasting tools for integrated risk and mitigation analysis for climate change adaptation and in response to extreme weather events by taking fully into account biodiversity requirements by targeting good ecological status and e.g. fish migration; water flows and sediment dynamics not hampering flexible hydropower production, innovative techniques for enhancing the life time of concrete structures and the overtopping safety of embankment and rockfill structures.
null
Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B. Activities may start at any TRL.
No hay datos disponibles
This Destination includes activities targeting a sustainable, secure and competitive energy supply. In line with the scope of cluster 5, this includes activities in the areas of renewable energy; energy system, grids and storage; as well as Carbon Capture, Utilisation and Storage (CCUS).
This Destination contributes directly to the Strategic Plan’s Key Strategic Orientations ‘Green transition’, ‘Digital transition’ and ‘A more resilient, competitive, inclusive and democratic Europe’.
In line with the Strategic Plan, the overall expected impact of this Destination is to contribute to the ‘Ensuring more sustainable, secure and competitive energy supply through solutions for smart energy systems based on renewable energy solutions’.
This destination contributes to the activities of the Strategic Energy Technology Plan (SET Plan) and its implementation working groups.
The main impacts to be generated by topics under this Destination are:
Renewable energy
Energy systems, grids and storage
Carbon capture, use and storage (CCUS) and carbon dioxide removal (CDR)
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination. For additional information please see “Restrictions on the participation of legal entities established in China” found in General Annex B of the General Annexes.
[1] For an example of a methodology for the assessment of sustainability, circularity and contribution to EU resilience and technological autonomy of clean energy technology in the R&I pipeline, please see Study on circular approaches for a sustainable and affordable clean energy transition
HORIZON Innovation Actions
HORIZON-CL5-2027-07-D3-11, HORIZON-CL5-2027-07