JRC Petten is currently realizing a construction project for the complete renovation of the entrance to the site called IPE (integrated Petten entrance). The project consists of two sub-projects, the which is currently under construction , and the project which is the subject of this request (named : IPE exterior security measures)
The project includes :
• Installation of 2x4 automatic retractable bollards to protect the facilities from high-speed hostile vehicles
• Installation of eight light-duty barriers to control vehicle access and security checks;
• Installation of 4 speed gates (night gates) to prevent unauthorized individuals or protesters from entering the site.
• Installation of the fixed fences around the new security and entrance building and between the security gates
• Installation of license plate camera, speeding camera, traffic signing speed/parking/traffic rules), detection loops, anti-collision flowerpots and two flag poles
• Integration of the exterior security measures to the controls of the security control room and the guard house
No hay datos disponibles