Construction of Rize Wastewater Collection System (Lot 2) - Completion Works

Próximamente
tender

Detalles de la convocatoria

Descripción

The scope of work is summarised as bellow:
a) Construction of approximately 3.039 km wastewater collector pipeline, including ground
improvement works,
b) Construction of approximately 30 m Special Crossing of river by pipejacking and/or
horizontal drilling wastewater collector pipeline,
c) Construction of 3 prefabricated GRP (Glass Reinforced Plastic) Package Type
Wastewater Pumping Station (Bağdatlı, Çiftekavak and Hal)
d) Approximately 12 m forced mains and associated structures,
e) Construction of approximately 87 manholes, including relevant ground improvement
works
f) Installation of complementary SCADA System which is composed of operator
workstation system, SCADA software and licences, other relevant software and licences,
and system accessories
g) Preparation of wastewater collection system network as-built plans for constructed sewer
mains,
h) Complementary works and documentation, including:

  1. CCTV inspection for approximately 6,920 m installed pipes,
  2. Leakage test for approximately 963 m installed pipes,
  3. Leakage test for approximately 44 manholes,
  4. Completion of non-completed bridge crossing works,
  5. Correction of non-conformities,
  6. Provision of Certificate of Origin in accordance with Sub-Clause 7.9,
  7. Preparation and submission of as-built plans for completed works.
    The design for the wastewater collection system involves, in most cases, the complete
    replacement of the existing pipelines. As these existing pipelines are “live” the Contractor shall
    need to carefully plan the works to maintain wastewater collection services to customers as much
    as possible. This issue shall be valid for all “live” wastewater pumping stations. During this
    planning, the service continuity should be in the first priority. System temporary rearrangements
    to be done for service continuity shall be taking into consideration during pricing. In wastewater
    collection system, package wastewater pumping station shall be supplied and installed during the
    construction of new one. These facilities shall be in operation until the final acceptance.